Air view of the Flummenthal river power station

Run-of-river power plant Flumenthal

The Flumenthal power station was first put into service in 1970. Following measures to increase the capacity to 27 MW, the three turbine-generator groups now generate an average of 146 GWh of renewable hydroelectric power per year. This corresponds to an increase of 6 percent.

The modernisation of the power station between 2006 and 2009 comprised a general overhaul of the machine groups with the installation of new turbine shafts and flow-modified turbine wheels, the replacement of the electrical control and regulation equipment, as well as the auxiliary power and generator systems.

Facts & figures

Plant type:

run-of-river power plant

Location:

Riedholz, Switzerland

Number of turbines:

3 bulb turbines

Capacity:

27 MW

Shareholding:

62.1%

Commissioning:

1970/2009

Average annual production:

146 GWh

Guided tours:

No

Status:

In service

Projects

Switzerland

Flumenthal hydropower plant, new fish pass

Alpiq will build a completely new fish pass at the Flumenthal hydropower plant. It will fulfil the current standards for fish migration in the River Aare. The construction work will be completed by the end of 2023. Alpiq Hydro Aare AG is investing 16 million Swiss francs.