The idea for the construction of a small hydropower plant was conceived in 2007 in collaboration with the municipality of Peist (Swiss canton of Grisons) and Arosa Energie. The investment amounted to approximately CHF 2.7 million. The ground breaking took place on 7 April 2017.
Facts & figures
Plant type:
Small-scale hydropower plant
Location:
Arosa, Switzerland
Number of turbines:
1 Pelton, vertical axis, Troyer
Capacity:
0.295 MW
Shareholding via Entegra:
51 %
Commissioning:
Q3/2018
Average annual production:
1.2 GWh
Guided tours:
No
Status:
In service